Outdoor Kitchen Remodeling in Marco Island.

    SHORT ANSWER

    An outdoor kitchen or lanai project in Southwest Florida runs roughly 7–11 weeks depending on scope — marine-grade materials, gas and electrical to code, and Collier or Lee County permits filed by us.

    Construction time
    7–11 weeks
    Materials
    Marine-grade · coastal-rated
    Permits
    Gas · electric · structure
    Your planning range
    In writing, at the free session
    01

    What changes in Marco Island.

    M-01

    Salt-air specs everywhere

    Every property on Marco is coastal. Hardware, cabinet boxes and sealants chosen to survive it.

    M-02

    Island delivery logistics

    Material staging and delivery windows planned for the bridge, the season and beachfront access rules.

    M-03

    Beachfront board packages

    High-rise associations from South Seas to Cape Marco — approval packages prepared to pass first review.

    M-04

    Collier County permits

    Filed in-house during the Plan phase, inspections managed through final sign-off.

    M-05

    Canal-home realities

    Dock-side access, flood-zone code and elevation rules reviewed before design is final.

    M-06

    One team, one number

    Designers, builders and permit runners under one roof — one accountability for the whole island project.

    Outdoor Kitchen Remodeling in Marco Island — questions

    Do outdoor kitchens need permits in Collier County?+

    Yes — gas, electrical and structural work all require permits. We prepare and file the set and manage inspections through sign-off.

    What materials survive salt air?+

    Marine-grade stainless, sealed stone and porcelain cladding. We specify from experience, not catalogue defaults.

    BEGIN — FREE, NO OBLIGATION

    Your free design session — worth having even if you never hire us.

    Two hours with the people who design and build. You keep the concept board and the written planning range either way.

    NO OBLIGATION · WE REPLY SAME BUSINESS DAY
    (239) 298-4544Free Design Session