Kitchen Remodeling in Naples.
A kitchen remodel in Southwest Florida runs 6–10 weeks of construction after 2–4 weeks of design and permitting. Condo buildings add 3–5 weeks of board review. Your written planning range is delivered at the free design session — before any contract.
- Construction time
- 6–10 weeks
- Design + permitting
- 2–4 weeks before demo
- Condo board review
- add 3–5 weeks
- Your planning range
- In writing, at the free session
What changes in Naples.
Collier County permits
Filed in-house during the Plan phase — construction never waits on paperwork or a third-party expediter.
HOA & board diplomacy
Approval packages for Naples' towers and gated communities, prepared to be approved on first pass.
Coastal materials
Salt air, humidity and sound ratings — selections specified from experience, not catalogue defaults.
Seasonal scheduling
Projects planned around your season: leave in May, arrive in November to a finished home.
Flood & code realities
Post-storm code requirements and elevation rules shape scope in waterfront properties — reviewed before design is final.
One team, one number
Designers, builders and permit runners under one roof — no juggling a designer, a GC and three subs.
Kitchen Remodeling in Naples — questions
How long does a kitchen remodel take?+
6–10 weeks of construction for most projects, after 2–4 weeks of design and permitting. Appliance and cabinet lead times are locked during Plan so the build never waits on deliveries.
What drives the cost of a kitchen remodel?+
Scope first, finish level second, building type third, access fourth. You receive a written planning range for your specific kitchen at the free design session — before any contract.
Can you remodel a kitchen in a high-rise condo?+
Yes — it's a specialty. Board package, elevator reservations, sound-rated flooring and work-hour plans are handled before demo day. Check the HOA Approval Library for your building.
Do I need to move out?+
Most clients stay — or are away for the season. We isolate the work zone, protect paths and set up a temporary kitchen station when the layout allows.
Do you handle permits and inspections?+
Yes. Collier or Lee County permit sets are prepared and filed by us, and we manage every inspection through final sign-off.
Your free design session — worth having even if you never hire us.
Two hours with the people who design and build. You keep the concept board and the written planning range either way.