Bathrooms built for Gulf humidity.

    SHORT ANSWER

    A bathroom remodel in Southwest Florida runs 4–8 weeks of construction after design and permitting. Waterproofing membranes, ventilation and tile specified for the Gulf climate. Your written planning range is delivered at the free design session — before any contract.

    Construction time
    4–8 weeks
    Design + permitting
    2–4 weeks before demo
    Condo board review
    add 3–5 weeks
    Your planning range
    In writing, at the free session
    01

    What the scope covers.

    S-01

    Layout & wet areas

    Wet-room conversions, curbless showers, tub-to-shower swaps and structural review where walls move.

    S-02

    Waterproofing

    Full membrane systems and flood testing — done right for high humidity, not patched.

    S-03

    Tile & stone

    Porcelain, natural stone and mosaic work with sound-rated assemblies for condo floors.

    S-04

    Plumbing & fixtures

    Relocations, valves, drainage and fixtures — permitted and inspected.

    S-05

    Electrical & ventilation

    Lighting layers, dedicated circuits, and ventilation sized for the Gulf climate.

    S-06

    Vanities & finish

    Custom vanities, mirrors, glass enclosures, paint and final detailing.

    02

    Phase by phase, to the week.

    01

    Discover

    WEEK 0
    02

    Design

    WEEKS 1–4
    03

    Plan

    WEEKS 4–6
    04

    Build

    WEEKS 6–18
    05

    Follow

    THROUGHOUT
    06

    Complete

    FINAL WEEK
    The full process, with the five written guarantees →

    Questions about bathroom remodeling

    How long does a bathroom remodel take?+

    4–8 weeks of construction for most bathrooms, after design and permitting. Long-lead items like glass enclosures and custom vanities are ordered during Plan so the build never waits.

    What drives the cost of a bathroom remodel?+

    Scope, finish level, building type and access. You receive a written planning range for your specific bathroom at the free design session — before any contract.

    Can you prevent mold and humidity problems?+

    Yes — full waterproofing membranes, flood testing and ventilation sized for Gulf humidity are standard on every wet area we build.

    Do you handle condo board approval?+

    Yes — board package, elevator reservations and work-hour plans are handled before demo day. Check the HOA Approval Library for your building.

    BEGIN — FREE, NO OBLIGATION

    Your free design session — worth having even if you never hire us.

    Two hours with the people who design and build. You keep the concept board and the written planning range either way.

    NO OBLIGATION · WE REPLY SAME BUSINESS DAY
    (239) 298-4544Free Design Session